View all posts
halynamaksymiv5957
ProZ.com Certified Professional

Halyna Maksymiv posting from ProZ.com at 2:23 AM on 2 Aug 2024

Drilling Site Logs, Well Log. Pit Log. Facility daily log. Well Drill Log for Geological Engineer

  • Ukrainian English
  • 2,646 words
  • 0% complete
  • Техника (в целом)
Sign in to leave a reply to Halyna Maksymiv.